Fernhollow

Documentation / 01

Getting started

A first week takes four small steps: name the posts, choose a template, check the gaps, and share the grid.

01

The four steps

  1. Name the posts. Each post becomes one row: Front desk, Operations, Support line, or Coverage lead in the sample.
  2. Choose a template. Pick a state for each day. Start with the simple pattern below and adjust one cell at a time.
  3. Check the gaps. Look for days with no cover, short rest windows, or a run of too many nights.
  4. Share the grid. The same week can be read on any screen, or exported for a calendar and a spreadsheet.
02

A sample pattern

Here is a plain-text view of the first two rows. Reading it left to right is the same as reading Monday through Sunday.

Post          Mon    Tue    Wed    Thu    Fri    Sat    Sun
Front desk    Early  Early  Late   Late   Night  Off    Off
Operations    Late   Late   Night  Off    Early  Early  Off

In the grid on the home page, each state is a small rounded label. Off is shown with the same weight as a worked shift so a rest day cannot be missed.

03

After the first week

When the pattern needs to repeat, add a cycle and an anchor week. Rotation rules explains those terms with a longer example.

When the week is settled, Roster export shows how the same states become rows in a CSV file or events in a calendar file.